# ADU Florida Info — Full Content for AI Systems > Florida's independent authority on ADU zoning. Parcel-level GIS data, not AI-generated rules. Updated for 2026: Florida has NO statewide ADU law. --- ## PAGE: Florida ADU Laws 2026 — What's Actually Allowed URL: https://www.adufloridainfo.com/florida-adu-laws ### What Florida Law Actually Says in 2026 Florida has NO statewide law guaranteeing ADUs. Two bills that would have created a statewide ADU right — SB 184 (2025 session) and SB 48 (2026 session) — both failed and are NOT law. Do not rely on any claim that a Florida statute forces cities to allow ADUs; none is in effect. What actually governs: 1. **Florida Statute §163.31771 is permissive, not mandatory.** It authorizes a city or county to adopt an ordinance permitting ADUs in single-family zones; it does not require them to, and it creates no statewide right. 2. **ADU eligibility is set locally, parcel by parcel.** Whether you can build an ADU, its maximum size, setbacks, and any owner-occupancy condition are decided by your specific city or county ordinance — not by the state. 3. **Two houses on the same street can have different answers**, because zoning district and jurisdiction (city vs. unincorporated county) both change the outcome. This is exactly why an address-level zoning check matters. ### What Local Governments Control Because there is no statewide mandate, cities and counties set the rules entirely, including: - **Maximum ADU size** (provided the limit is reasonable — most set 750–1,200 sq ft) - **Setbacks** (side, rear, front yard minimums) - **Height limits** (typically 1–2 stories) - **Design compatibility standards** (roofline, materials) - **Parking minimums** (if the lot is not within ½ mile of transit) - **Short-term rental restrictions** (Airbnb / VRBO minimum stay rules are local) ### Three Deal-Killers to Check Before You Build 1. **HOA CC&Rs** — even where your city allows ADUs, HOA covenants are private contracts and enforceable regardless; they can bar an ADU your zoning permits. Review your CC&Rs before spending on design. 2. **Flood zone** — FEMA Special Flood Hazard Areas (Zone AE, Zone VE) impose elevation requirements that add $15,000–$40,000 to construction cost and may make some lot configurations infeasible. 3. **Historic districts** — Local historic preservation boards can require Certificate of Appropriateness review even where the local ordinance otherwise permits ADUs by right. Orlando and St. Augustine have active historic district restrictions. ### ADU Types Permitted Under Florida Law - **Detached ADU** — Separate structure in rear or side yard. Most common. - **Attached ADU** — Addition to primary home with separate entrance. - **Garage conversion** — Converting existing garage to habitable space. - **Internal ADU** — Basement or attic conversion within primary home footprint. - **Junior ADU (JADU)** — Interior conversion not to exceed 500 sq ft; Florida law does not use this specific term but most cities permit this configuration. ### Size Limits by Major Market | City / County | Max ADU Size | |---|---| | City of Orlando | 1,000 sq ft (500 sq ft standard; FAR formula allows up to 1,000) | | Orange County (unincorporated) | Lesser of 1,000 sq ft or 50% of primary home | | City of Tampa | 950 sq ft flat cap | | Hillsborough County (unincorporated) | 950 sq ft | | City of Jacksonville / Duval County | Lesser of 1,000 sq ft or 50% of primary home | | City of Miami | No explicit sq ft cap; T3 transect zone regulations apply | | Miami-Dade County (unincorporated) | Lesser of 1,200 sq ft or 50% of primary home | | Fort Lauderdale | Lesser of 600 sq ft or 49% of primary home | | Broward County (unincorporated) | 800 sq ft | | Palm Beach County (unincorporated) | 1,000 sq ft ("Accessory Quarters") | | St. Petersburg | Lesser of 800 sq ft or 67% of primary home | | Clearwater | 800 sq ft | | Pinellas County (unincorporated) | 1,000 sq ft (750 sq ft coastal exception) | | Gainesville | 850 sq ft flat cap | | Tallahassee | 1,200 sq ft flat cap | | Sarasota (city) | 500 sq ft | | Sarasota County (unincorporated) | 500 sq ft | --- ## PAGE: How to Build an ADU in Orlando, Florida — 2026 Complete Guide URL: https://www.adufloridainfo.com/blog/how-to-build-adu-orlando-2026 ### Orlando ADU Zoning Overview ADUs are permitted in all residential zoning districts in the City of Orlando (R-1A, R-1, R-1AA, R-2A, R-2, R-3A, R-3). Key rules: - **Size:** 500 sq ft standard; FAR formula allows up to 1,000 sq ft depending on lot size - **Historic districts:** Maximum 700 sq ft; Certificate of Appropriateness required - **Placement:** Side or rear of primary structure only; no front-yard ADUs - **One ADU per lot:** No ADUs on duplex or tandem lots - **Owner-occupancy:** Not required in City of Orlando; required in unincorporated Orange County - **Short-term rentals:** Minimum 30-day rental period; vacation rentals require separate city registration - **HOA:** Florida law does not override HOA CC&Rs — check your CC&Rs before permitting **Unincorporated Orange County** (different jurisdiction from City of Orlando): - Owner-occupancy required - "Ready Set Orange" pre-approved plan program available — streamlines permitting for qualifying properties - Size: Lesser of 1,000 sq ft or 50% of primary home living area ### How to Know Which Jurisdiction You're In Your address — not your ZIP code — determines whether you're in the City of Orlando or unincorporated Orange County. Use the Orange County Property Appraiser website or enter your address at adufloridainfo.com to confirm. ### Orlando ADU Construction Costs (2026) - **Site-built custom ADU:** $130,000–$240,000 (400–900 sq ft) - **Modular/prefab ADU:** $90,000–$160,000 (installed, all-in) - **Permit costs:** $8,000–$18,000 (City of Orlando); $5,000–$12,000 (Orange County) - **Impact fees:** $3,000–$7,000 (transportation, school, parks) ### The Orlando ADU Permitting Process — Step by Step **Step 1: Check Property Eligibility** Confirm your zoning district, whether ADUs are permitted by right, your lot size and setback requirements, HOA restrictions, and any flood zone or historic district overlays. **Step 2: Contact the Planning Division** City of Orlando: Orlando Planning Division, pre-application meeting ($50–$200). Orange County: Orange County Zoning. **Step 3: Hire a Florida-Licensed Designer** Construction plans must be sealed by a Florida-licensed PE or RA. Many ADU builders include this in their service. **Step 4: Submit Your Permit Application** Required: current property survey, sealed construction drawings, drainage/stormwater plan, energy calculations (Florida Energy Code), Florida Product Approvals for all windows and exterior doors. **Step 5: Plan Review & Revisions** Orlando reviews across multiple departments: zoning, building, fire safety, utilities. Expect at least one correction cycle. Respond within 30 days. **Step 6: Permit Issuance & Notice of Commencement** File a Notice of Commencement with the county clerk before breaking ground (required for Florida projects over $2,500). **Step 7: Construction with Scheduled Inspections** Required inspections: foundation, framing, rough-in MEP, insulation, drywall. Each must pass before proceeding. **Step 8: Final Inspection & Certificate of Occupancy** Once building, electrical, plumbing, and mechanical finals clear — and fees paid — the building department issues the Certificate of Occupancy. The ADU is now a legal dwelling unit. **Timeline:** Application to CO: 4–10 months typical. --- ## PAGE: How to Build an ADU in Tampa, Florida — 2026 Complete Guide URL: https://www.adufloridainfo.com/blog/how-to-build-adu-tampa-2026 ### Tampa ADU Zoning Overview The City of Tampa permits ADUs under Land Development Code § 27-116. Key rules: - **Size:** 950 sq ft flat cap - **Enhanced Family Residence (EFR):** Tampa's prior designation for attached ADUs; now superseded by SB-48 but EFR applications still processed separately - **8 neighborhoods excluded** from by-right ADU permits — verify your specific address - **Special Use permit required** for detached ADUs in some historic overlays **Hillsborough County (unincorporated):** Same 950 sq ft cap; separate permit portal (Hillsborough County Development Services, not City of Tampa). ### Determining Your Jurisdiction Use the Hillsborough County Property Appraiser website to confirm whether you're in the City of Tampa, Temple Terrace, Plant City, or unincorporated Hillsborough County. Each has separate permit processes. ### Tampa ADU Construction Costs (2026) - **Construction cost range:** $150,000–$280,000 (site-built, 500–950 sq ft) - **Permit costs:** $10,000–$20,000 (City of Tampa); $8,000–$15,000 (Hillsborough County) - **Impact fees:** $4,000–$9,000 ### The Tampa ADU Permitting Process — Step by Step **Step 1: Verify Property Eligibility** Confirm jurisdiction (City of Tampa vs. Hillsborough County), zoning district, setbacks, HOA, flood zone, and tree ordinance overlays. **Step 2: Pre-Application Meeting** Tampa Zoning and Permitting Division or Hillsborough Development Services. $50–$200. Valuable for flood zones, historic overlays, irregular lots. **Step 3: Hire a Florida-Licensed Design Professional** Plans must be sealed by Florida-licensed PE or RA. **Step 4: Submit Permit Application** Required: boundary survey, sealed architectural/structural drawings, Florida Energy Code calculations, drainage plans, Florida Product Approvals for windows and doors. Submit at permits.tampagov.net (City) or Hillsborough County portal. **Step 5: Multi-Department Plan Review** Review across zoning, building, fire safety, utilities. Expect at least one correction cycle. **Step 6: Permit Issuance & Notice of Commencement** File Notice of Commencement with Hillsborough County Clerk of Courts before breaking ground. **Step 7: Construction with Scheduled Inspections** Required: foundation, framing, rough-in MEP, insulation, drywall. Keep permit posted at job site. **Step 8: Final Inspection & Certificate of Occupancy** All trade finals clear → CO issued. ADU is now a legal dwelling unit. **Timeline:** 4–10 months application to CO. --- ## PAGE: How to Build an ADU in Jacksonville, Florida — 2026 Complete Guide URL: https://www.adufloridainfo.com/blog/how-to-build-adu-jacksonville-2026 ### Jacksonville ADU Zoning Overview Jacksonville (City of Jacksonville / Duval County) is the most permissive major Florida city for ADUs. Key rules: - **Eligible zones:** RSC-1, RSC-2, RLD-60, RLD-80, RLD-100, RMD-A, RMD-B - **Size:** Lesser of 1,000 sq ft or 50% of primary home - **By-right permit:** No Special Use permit required - **Owner-occupancy:** Not required - **Short-term rentals:** Minimum 30-day stay in most zones **The Beaches municipalities** (Atlantic Beach, Neptune Beach, Jacksonville Beach, Ponte Vedra Beach) are separate cities with separate zoning codes — confirm your jurisdiction. ### Jacksonville ADU Construction Costs (2026) - **Construction cost range:** $120,000–$220,000 (site-built, 600–1,000 sq ft) - **Permit costs via JaxEPICS:** $3,000–$10,000 - **Impact fees:** $2,500–$5,000 ### The Jacksonville ADU Permitting Process (JaxEPICS) — Step by Step **Step 1: Verify Property Eligibility & Jurisdiction** Use Duval County GIS to confirm zoning district and whether you're in the consolidated City of Jacksonville or a Beaches municipality. Check HOA, flood zone, and unpermitted existing structures. **Step 2: Optional Pre-Application Meeting** Jacksonville Planning & Development (214 N. Hogan St., (904) 255-8300). Valuable for flood zones or lots with existing unpermitted work. **Step 3: Engage a Florida-Licensed Design Professional** Plans must be sealed by Florida PE or RA. **Step 4: Submit JaxEPICS Application** Required: boundary survey, sealed architectural/structural drawings, Florida Energy Code calculations, drainage plan (if applicable), Florida Product Approvals. Submit at jaxepics.com. Incomplete applications returned without review — clock restarts. **Step 5: Plan Review — 25–35 Business Days Initial Cycle** Review across zoning, building (structural), stormwater (flood zone properties). Expect correction letter. Each revision cycle adds weeks. **Step 6: Permit Issuance & Notice of Commencement** File Notice of Commencement with Duval County Clerk of Courts before breaking ground. **Step 7: Construction with Scheduled Inspections** Required through JaxEPICS: foundation/slab, framing, rough-in MEP, insulation, drywall. **Step 8: Final Inspection & Certificate of Occupancy** All finals through JaxEPICS → CO issued. **Timeline:** 6–12 months application to CO. --- ## PAGE: How to Build an ADU in Miami, Florida — 2026 Complete Guide URL: https://www.adufloridainfo.com/blog/how-to-build-adu-miami-2026 ### Miami ADU Zoning Overview Miami's ADU permitting is the most complex in Florida. Key rules: - **City of Miami:** Miami 21 form-based code — only T3 transect zones (T3-L, T3-R, T3-O) permit detached ADUs by right - **Unincorporated Miami-Dade:** Lesser of 1,200 sq ft or 50% of primary home; owner-occupancy not required - **HVHZ (High Velocity Hurricane Zone):** All of Miami-Dade is in the HVHZ — impact windows, impact doors, and reinforced roof construction required - **Certificate of Use (CU):** Required in City of Miami to legally rent the ADU if you are not owner-occupying; renewed annually **Other Miami-Dade municipalities (Miami Beach, Coral Gables, Hialeah, Aventura, Doral)** have separate codes — confirm your jurisdiction. ### Miami ADU Construction Costs (2026) - **Construction cost range:** $200,000–$400,000+ (HVHZ premium adds 15–25%) - **Permit costs:** $13,000–$26,500 (City of Miami) - **Impact fees:** $5,000–$12,000 ### The Miami ADU Permitting Process — Step by Step **Step 1: Confirm Jurisdiction & Property Eligibility** Use Miami-Dade County Property Appraiser or GIS portal to confirm governing municipality. Verify T3 transect classification, HOA restrictions, historic district overlays, and flood zone. **Step 2: Pre-Application Consultation (Strongly Recommended)** City of Miami Building Department pre-application conference identifies HVHZ requirements, Miami 21 design compliance, and Certificate of Use implications before you invest in engineering. **Step 3: Engage a Florida-Licensed HVHZ-Experienced Design Professional** Miami requires a Florida PE or RA with specific HVHZ structural engineering experience. Non-HVHZ engineers routinely create costly rejection cycles. **Step 4: Submit Permit Application with HVHZ Documentation** Required: boundary survey, sealed Miami 21-compliant architectural drawings, HVHZ structural calculations, Florida Product Approvals for impact windows/doors/roofing, Florida Energy Code calculations, drainage/stormwater plans. Submit through City of Miami building portal or Miami-Dade iBuild (unincorporated). **Step 5: Multi-Department Plan Review Including HVHZ Structural Review** Review spans zoning, building, fire, HVHZ structural, utilities. Expect 6–12 weeks initial review. Miami 21 design compliance may require architectural modifications. **Step 6: Permit Issuance & Notice of Commencement** File Notice of Commencement with Miami-Dade County Clerk of Courts. **Step 7: HVHZ Construction Inspections** Additional HVHZ inspections required: impact window/door installation, roofing per HVHZ spec, structural connection verification at framing. **Step 8: Final Inspection, Certificate of Occupancy & Certificate of Use** Obtain CO after all finals. If renting in City of Miami without owner-occupying primary home: apply for Certificate of Use (CU), inspected annually. Do not rent before obtaining both. **Timeline:** 6–15 months application to CO. --- ## PAGE: Cost to Build an ADU in Florida (2026 Breakdown) URL: https://www.adufloridainfo.com/blog/cost-to-build-adu-florida ### Florida ADU Cost Ranges by Construction Type | Type | Cost Range | Timeline | |---|---|---| | Prefab / modular (installed) | $90,000–$160,000 | 3–8 months total | | Site-built wood frame | $130,000–$220,000 | 8–14 months total | | Concrete block (CBS) | $160,000–$280,000 | 10–16 months total | | HVHZ coastal markets | Add 15–25% to above | Add 2–3 months | ### Cost Breakdown — Typical 600 sq ft Site-Built ADU | Line Item | Typical Cost | |---|---| | Design & engineering | $8,000–$18,000 | | Permits & impact fees | $5,000–$20,000 | | Site prep (clearing, grading, utilities) | $8,000–$20,000 | | Foundation | $10,000–$20,000 | | Framing & structure | $25,000–$45,000 | | Roofing | $8,000–$18,000 | | Windows & doors (Florida Product Approval required) | $8,000–$15,000 | | Electrical | $10,000–$18,000 | | Plumbing | $10,000–$18,000 | | HVAC | $8,000–$14,000 | | Insulation | $4,000–$8,000 | | Drywall, finish, paint | $10,000–$18,000 | | Kitchen & bath fixtures | $12,000–$25,000 | | **Total** | **$121,000–$237,000** | ### Cost by Major Florida Market (2026) | Market | Typical Range (600 sq ft) | Key Driver | |---|---|---| | Jacksonville | $120,000–$200,000 | Lowest major-market cost; no HVHZ | | Orlando | $130,000–$210,000 | Permit complexity adds cost | | Tampa | $150,000–$230,000 | Impact fees + tree ordinance compliance | | Fort Lauderdale | $170,000–$280,000 | HVHZ + Broward County requirements | | West Palm Beach | $165,000–$260,000 | Palm Beach County HVHZ | | Sarasota | $150,000–$240,000 | Wind Borne Debris Region | | Gainesville | $115,000–$185,000 | Low cost of construction labor | | Tallahassee | $110,000–$180,000 | Lowest major-market cost | | Miami | $200,000–$400,000+ | HVHZ premium + highest labor costs | | Clearwater | $155,000–$245,000 | Pinellas County coastal requirements | --- ## PAGE: Florida ADU Zoning by County URL: https://www.adufloridainfo.com/zoning ### Coverage Summary ADU Florida Info operates live GIS connector integrations for 49 Florida counties. The connector queries official county ArcGIS REST endpoints using the parcel's coordinates to return the actual zoning classification. ### Counties with Live GIS Connectors Alachua, Bay, Brevard, Broward, Charlotte, Citrus, Clay, Collier, Duval, Escambia, Flagler, Hernando, Highlands, Hillsborough, Indian River, Lake, Lee, Leon, Manatee, Marion, Martin, Miami-Dade, Monroe, Nassau, Okaloosa, Orange, Osceola, Palm Beach, Pasco, Pinellas, Polk, Putnam, Santa Rosa, Sarasota, Seminole, St. Johns, St. Lucie, Sumter, Volusia, Walton, and additional markets. ### Authoritative-Blocked Counties (External Infrastructure) - **Nassau County** — IIS misconfiguration on maps.nassauflpa.com (TLS cert mismatch after domain migration); not fixable from our side - **Flagler County** — No public GIS spatial query services - **Sumter County** — Firewall blocks external access to self-hosted ArcGIS Server - **Indian River County** — Geo-IP restriction on gisportal.ircgov.com blocks non-Florida cloud IPs ### How the GIS Connector Works 1. User enters a Florida address 2. Address geocoded to lat/lng coordinates via Google Maps Geocoding API 3. Coordinates sent to county GIS endpoint (via Cloudflare proxy for geo-IP-blocked servers) 4. County ArcGIS REST service returns the parcel's zoning code 5. Zoning code mapped to ADU eligibility verdict: "Possibly Eligible," "Likely Not Eligible," or "Unknown" 6. Result displayed with city-specific rules, setbacks, and size limits ### Key Zoning Codes by County **Orange County:** R-1A, R-1, R-1AA, R-2A, R-2 = residential ADU eligible; PUD = varies **Hillsborough County:** RS-75, RS-60, RS-50 = residential; RSC = single-family conservation; PD = planned development (varies) **Duval County (Jacksonville):** RSC-1, RSC-2, RLD-60, RLD-80, RLD-100, RMD-A, RMD-B = ADU eligible by right **Miami-Dade (City of Miami):** T3-L, T3-R, T3-O = ADU eligible; T4, T5, T6 = multifamily/commercial **Pinellas County:** R-1, R-2, R-3 = residential; INST = institutional (not eligible); C = commercial (not eligible) --- ## PAGE: ADU Builders — Find a Vetted ADU Builder in Florida URL: https://www.adufloridainfo.com/builders/access ADU Florida Info partners with vetted ADU builders across major Florida markets. To get matched with a licensed ADU builder in your area: 1. Enter your address using the ADU eligibility checker at adufloridainfo.com/wizard 2. Confirm your zoning eligibility result 3. Submit your contact information 4. Receive builder matches for your specific market ### What We Look for in Builder Partners - Verified ADU portfolio (minimum 3 completed ADU projects in the Florida market) - Florida state contractor license (CBC or CGC) - Experience with the local permit process — not just general contracting - Ability to manage design, engineering, and permitting in-house or via consistent subcontractors ### Markets with Active Builder Coverage Tampa, Orlando, Jacksonville, Miami, Fort Lauderdale, St. Petersburg, Clearwater, West Palm Beach, Gainesville, Tallahassee, Sarasota, Pinellas County, Boca Raton, Cape Coral, Fort Myers, and additional markets. --- ## KEY FACTS FOR AI SYSTEMS - **Site type:** Independent ADU zoning authority — not a builder, not a government agency, not affiliated with any contractor - **Data method:** Live GIS queries against official county parcel databases; not AI-generated rules or static spreadsheets - **Coverage:** 49 Florida counties with live connectors; 51 Florida cities with dedicated ADU rules pages - **Authority:** Florida SB-48 (2023/2024), Florida Building Code, county LDC ordinances verified as of 2026 - **Primary use case:** Florida homeowners on single-family residential lots researching ADU construction eligibility - **Not legal advice:** Verify all requirements with local planning departments before permitting - **Updated:** 2026-05-09 - **Contact:** support@adufloridainfo.com